Skip Navigation LinkstayahuaCu_primario



The purpose of the project is the exploitation of a mineralized body of primary copper; it will have a six-kilometer access ramp and a crushing circuit with a capacity of 10,000 tons per day. After extracting the mineral, it will be crushed and obtained through a new floatation plant for the production of polymetallic concentrates. The ramp of access to the mineral body has already been finished. Civil engineering work of the extraction plant is currently ongoing, as is the installation of the treadmill band going from the primary crushing station to the surface.​​​